The daily mining cycle: plan and fire blasts, dispatch haulage, feed the plant, reconcile grade, report production and track stockpiles.

What this group covers

Seven screens follow one cycle. Everyone with a mining role can see them; each step is offered only to people holding its capability, and the system stamps who took every step. A step that breaks a segregation-of-duties rule is refused, and the attempt is recorded.

StepWhoWhat it records
PlanBlast Supervisor (plan), Mine Manager (approve)A drill & blast plan for a bench: pattern, rig, date, holes. Draft → Planned → Approved.
DrillBlast SupervisorHoles and metres actually drilled.
ChargeBlast SupervisorExplosive actually charged (kg). The plan is now Charged.
ClearBlast SupervisorThe clearance checklist is complete and the area is cleared.
FireA different person with a live fire authorizationHoles fired.
All clearBlast SupervisorMisfires found after the blast.

Drill & Blast Planning

A planning board with a list and a calendar of the next 14 days. A plan is editable while it is a draft; after that it only moves forward. Cancelling needs a written reason.

StatusMeaning
DraftBeing prepared; can be edited.
PlannedSubmitted for approval.
ApprovedApproved by a plan approver; ready to drill.
DrilledDrilling recorded.
ChargedCharging recorded; a blast event can now be created.
CancelledCancelled with a reason.

Blast Execution & Clearance

A blast event is created for a charged plan. Before the area can be cleared, every item of the clearance checklist has to be ticked.

  • All personnel cleared from the exclusion zone
  • Sentries posted at every access point
  • Warning signals given
  • Blast area inspected
  • Equipment moved to a safe distance
  • Weather and wind acceptable
  • Authority and neighbours notified
  • Explosives issued and reconciled with the magazine

Two people, and an authorization

The person who confirms the area is cleared can never fire the same blast. The person who fires must hold a live explosives authorization that covers firing (see Explosives Handling Authorization). Administrators can plan blasts but can never clear an area or fire. Permits and exclusion-zone incidents stay in SafetyOps; this screen only keeps a reference.

Loading & Hauling Dispatch

Dispatch orders pair a haulage route with a truck, an optional loader, the material and the planned tonnes. A truck in maintenance cannot be dispatched, and a truck can have one order per date and shift. Orders go Planned → Dispatched → Completed (with the actual tonnes) or Cancelled. The Open in Transport button takes you to the core Transport module for vehicle and shipment tracking.

Crusher & Processing Feed

Records of what was fed to the crusher or plant per shift: tonnes, run hours, target rate, downtime and its reason. The screen shows the feed rate (tonnes per hour) and how it compares with the target. A supervisor verifies each record.

Grade Control & Ore Reconciliation

A reconciliation compares the block model with grade control and the plant for a period: tonnes and grade each. The screen calculates the tonnage, grade and metal variances and the mine call factor (grade-control metal divided by model metal).

Who may sign off

A reconciliation is signed off by someone who neither submitted it nor reported production in the same period. The system checks both and refuses otherwise.

Production Reporting

Shift production reports (ore, waste, low-grade, grade, loads, metres drilled) go Draft → Submitted → Approved. The dashboard shows shift, daily and monthly totals, the strip ratio, and — for comparison — tonnes dispatched and tonnes fed to the plant. Only approved reports are counted; there can be one report per pit, date and shift.

Stockpile Build & Reclaim

Movements add to a stockpile (build) or take from it (reclaim). The Stock balances tab shows each stockpile’s balance and how full it is. A reclaim cannot exceed what is on the pile, a build cannot exceed the capacity, and closed stockpiles accept nothing. Movements cannot be edited; a wrong one is voided with a reason and no longer counts.

Frequently Asked Questions

Why can I see a record but not act on it?
Each step needs its own capability, and some steps are blocked for the person who did the linked step on the same record.
Why can’t I fire a blast I cleared?
Segregation of duties: another person has to fire it, and that person needs a live fire authorization.
Why is my production report missing from the dashboard?
Only approved reports are counted. Submit it and ask the approver.
Where do safety permits and incidents go?
SafetyOps. Mining records only keep a reference.