TotalApp Docs

Mining & Natural Resources — Geology & Resource

Keep the block model, samples, resource and reserve statements, surveys and dilution in one controlled workflow — with approvals that a different person must give.

What this group covers

Five screens for the geology team. Everyone with a mining role can see them; each step is offered only to people holding its capability, and the system stamps who took every step. Approvals are enforced on the server: the person who prepared something can never approve it.

ScreenPrepared byApproved by
Block Model UpdatesGeologistMine Manager — never the person who submitted it
Grade Control SamplingGeologist (sample, assay)Mine Manager — never the sampler or the person who entered the result
Resource / Reserve UpdateGeologistMine Manager — never the person who submitted it
Survey & Survey ReconciliationGeologistMine Manager
Dilution & RecoveryGeologistMine Manager (review)

Block Model Updates

A change to a block model (new drilling, re-estimation, domain, density or topography update) goes Draft → Submitted → Approved → Released. The update must point at a model that is still a draft; the current model is frozen. Releasing makes that model the current one for the site and marks the previous current model as superseded. The approver can return the update with a reason. Every step is kept in the change history.

Maker and checker

The person who authored or submitted a block model update cannot approve it. The server refuses and records the attempt as a segregation-of-duties violation.

Grade Control Sampling

A sample is Collected → Sent to the laboratory → Assayed (the result is entered) → Approved. An approver can also send a result back for re-assay or reject the sample, both with a reason. The screen compares the assay grade with the expected grade from the model: the deviation in percent, and whether it matches (within ±10 %).

Who may approve a result

The person who took the sample and the person who entered the assay result can never approve it. The approver’s name is kept on the record, so the separation can be proven afterwards.

Resource / Reserve Update

A statement records tonnes and grade by category (measured, indicated, inferred, proved, probable) for a site, on the basis of a block model, with an optional cut-off grade. The screen calculates the contained metal (tonnes × grade) and, when the statement replaces an earlier one, the change in percent. Statements go Draft → Submitted → Approved and are frozen once submitted. Approving a replacement marks the statement it replaces as superseded.

Every create, edit and step is written to a change history — who, when, what changed and the figures at that moment — which cannot be edited. Use the History button on a row to read it.

Survey & Survey Reconciliation

A survey records the surveyed volume and density; the screen calculates the surveyed tonnes and compares them with the book tonnes: the difference in tonnes and percent. Each survey carries a tolerance threshold (5 % by default). Reconciling a survey whose difference is outside the tolerance needs a written note.

FigureCalculation
Surveyed tonnesVolume (m³) × density (t/m³)
Variance (t)Surveyed tonnes − book tonnes
Variance (%)Variance ÷ book tonnes × 100
Outside tolerance|Variance %| above the threshold

Dilution & Recovery Tracking

For a period and an area, record the ore planned, the ore mined and the waste that diluted it, with dilution and recovery targets. The screen calculates the figures and flags whether the period is on target.

FigureCalculation
Dilution (%)Dilution waste ÷ (ore mined + dilution waste) × 100
Recovery (%)Ore mined ÷ ore planned × 100
On targetDilution at or below target and recovery at or above target

Frequently Asked Questions

Why can I not approve my own update?
Segregation of duties: the person who prepared a block model update, sample result or resource statement cannot approve it. Ask a manager.
Why does my block model update refuse the model?
Updates must be made to a draft model. Once a model is current it is frozen — create or use a new draft.
Where is the history of a resource statement?
Open the History button on the row. It lists every change with who, when and the figures at that moment.
Where are the models and minerals defined?
In Operational Setup (Block Model Registry, Mineral & Grade). Approvals never happen in master data.